Industries / Engineering and manufacturing
Engineering work, with the record intact.
Document control, RFIs, quality, and change management. Every answer cites its source. Licensed professionals keep their sign-off.
- Awaiting approval
Engineering change request 2291
- Ready for review
RFI response draft
- Within limits
Supplier certificate check
Audit log
- Change agent assessed impact on 14 drawings
The work
The work we build, and who approves it.
Document control
What AI doesTracks revisions and flags conflicts between drawings and specifications.
Who approvesDocument controllers
RFIs and submittals
What AI doesDrafts responses with exact references.
Who approvesThe engineer of record
Engineering change
What AI doesAssesses a change across drawings, parts, and suppliers.
Who approvesThe change board
Quality records
What AI doesChecks inspection data and certificates, and flags nonconformances.
Who approvesQuality managers
Supplier communication
What AI doesLogs commitments and dates into the project or ERP record.
Who approvesBuyers confirm any change
Knowledge retrieval
What AI doesAnswers from approved standards and past projects, with sources.
Who approvesEngineers verify before use
Security and compliance
Built to the rules you already answer to.
- Every answer cites its document and revision.
- Access follows your project permissions.
- Controlled technical data stays in approved environments.
Frameworks we design to
- ISO 9001Quality management
- AS9100Aerospace quality management
- ISO/IEC 27001Information security management
- NIST SP 800-171Controlled unclassified information
- ITAR and EARExport controls
- CMMC 2.0Defense contractor cybersecurity
These are requirements we build to inside your program. They are not certifications held by SRV LAB.
Visit the Trust CenterYour people
What stays with your people.
- Engineering judgment and stamped drawings
- Change board decisions
- Nonconformance disposition
- Release to manufacturing
Your systems
Built around the systems you run.
Product names belong to their owners and do not imply a partnership.
Measurement
Measured in your numbers.
Measures agreed before we build. Results reported against your baseline.
Measures we agree on up front
- RFI turnaround time
- Hours spent searching for documents
- Change cycle time
- Nonconformances caught before release
Questions
What leaders ask us.
How do you keep a wrong answer out of a drawing?
Every answer cites its source. Nothing changes a controlled record without approval.
Can you work with controlled technical data?
Yes. It stays in approved environments. Export-controlled work is staffed only by U.S. persons.
Do we have to change our PLM or ERP?
No. We connect to the systems you already run.
